Slurm

COSMA’s batch queues are managed by the Slurm job scheduler. You describe the work in a job script, submit it to a queue, and Slurm runs it on compute nodes when they are free.

Which queue to use depends on your project: see queues. If in doubt, ask your project lead or supervisor, or email cosma-support@durham.ac.uk.

New to Slurm? These pages cover the basics:

Common commands

Command

What it does

sbatch myjob.sh

Submit a job script

squeue --me

List your pending and running jobs

squeue -p cosma8

List the jobs in a queue

scancel JOBID

Cancel a job

sacct -j JOBID

Show how a finished job went

scontrol show job JOBID

Show everything about a job

sinfo -s

Summarise the queues

srun --pty /bin/bash

Start an interactive shell on a compute node (add -p, -A and -t)

salloc

Allocate nodes, then run commands on them from your shell

showq -q cosma7

Show the jobs in a queue, with their sizes

sprio -j JOBID

Show how a pending job’s priority is calculated

sshare

Show your fairshare, which affects priority

slurmnodeprop

Summarise the properties of nodes or queues (use -h for details)

mybalance

Show your projects’ usage of their allocations (see the FAQ)

c8backfill

Show which nodes are free now, and for how long (see the FAQ for other queues)

c8jobload JOBID

Show how a running COSMA8 job is using its nodes (c7jobload for COSMA7)

Example job scripts are also in /cosma/home/sample-user.

For more detail, see man sbatch, man srun and so on, the online manual pages, the Slurm cheatsheet, or the Rosetta stone of batch systems if you have used another scheduler, such as LSF or PBS.

Time limits

Every job must have a time limit, set with -t. Most queues allow up to 3 days. The -prince queues allow 30 days, and the -pauper queues allow less: see queue variants.

Ask for a realistic time. Shorter jobs can often start sooner, because Slurm can fit them into gaps between larger jobs (see backfill). A job is stopped as soon as it reaches its limit, so allow some extra time.

Interactive jobs

To get a shell on a compute node, for example to test or debug:

srun -p cosma8-serial -A PROJECT -c 4 --mem=8G -t 01:00:00 --pty /bin/bash

When the shell starts, you are on the compute node. Please exit as soon as you have finished, because the job uses its resources until you do.

Use a queue that shares nodes, such as cosma8-serial or cosma5, unless you need whole nodes. On cosma7 and cosma8, even a short interactive job is charged for whole nodes.

X11 forwarding

To use graphical programs, such as a graphical debugger or profiler, log in with ssh -X or ssh -Y, then add --x11:

srun -p cosma8-serial -A PROJECT -c 1 --mem=4G -t 00:30:00 --x11 --pty /bin/bash

--x11 works with srun, but not with sbatch.

Direct compute node access

Performance co-pilot lets you analyse running jobs, and c8jobload shows how a job is using its nodes. If you need to ssh to a node that is running your jobs, please contact cosma-support.

Example job scripts

Replace PROJECT with your project, and the queue with one that your project can use. Each script loads modules that were tested together. For other combinations, see the list of modules.

MPI job over many nodes

This runs 512 MPI tasks, which is 4 COSMA8 nodes:

#!/bin/bash -l
#SBATCH --ntasks=512
#SBATCH -J myjob
#SBATCH -o myjob.%j.out
#SBATCH -e myjob.%j.err
#SBATCH -p cosma8
#SBATCH -A PROJECT
#SBATCH -t 72:00:00
#SBATCH --mail-type=END,FAIL
#SBATCH --mail-user=you@durham.ac.uk

module purge
module load gnu_comp/14.1.0 openmpi/5.0.3 parallel_hdf5

mpirun -np $SLURM_NTASKS ./myprogram myinputs

To use the Intel compiler and Intel MPI instead, replace the module load line with:

module load intel_comp compiler-rt tbb compiler mpi parallel_hdf5

Start Open MPI programs with mpirun, not srun. When started with srun, each copy of the program runs on its own, so a 4-task job runs four separate 1-task programs.

cosma8 and cosma7 always give a job whole nodes, so --exclusive is not needed.

Many similar jobs

A job array runs the same script several times. This runs 28 copies of a 128-task job, at most 4 at a time:

#!/bin/bash -l
#SBATCH --ntasks=128
#SBATCH -J myarray
#SBATCH --array=1-28%4
#SBATCH -o myarray.%A.%a.out
#SBATCH -e myarray.%A.%a.err
#SBATCH -p cosma8
#SBATCH -A PROJECT
#SBATCH -t 24:00:00

module purge
module load gnu_comp/14.1.0 openmpi/5.0.3 parallel_hdf5

# SLURM_ARRAY_TASK_ID is set to the copy's number, from 1 to 28.
mpirun -np $SLURM_NTASKS ./myprogram input_${SLURM_ARRAY_TASK_ID}

See job arrays for more.

MPI with OpenMP threads

This runs 2 MPI tasks on each of 4 nodes, each with its own set of cores for OpenMP threads:

#!/bin/bash -l
#SBATCH --nodes=4
#SBATCH --ntasks-per-node=2
#SBATCH --cpus-per-task=64
#SBATCH -J hybrid
#SBATCH -o hybrid.%j.out
#SBATCH -p cosma8
#SBATCH -A PROJECT
#SBATCH -t 12:00:00

module purge
module load gnu_comp/14.1.0 openmpi/5.0.3

export OMP_NUM_THREADS=$SLURM_CPUS_PER_TASK
mpirun -np $SLURM_NTASKS --map-by ppr:$SLURM_NTASKS_PER_NODE:node:PE=$SLURM_CPUS_PER_TASK ./myprogram

The --map-by option gives each task its own block of cores. Set --cpus-per-task to the cores per node divided by the tasks per node:

Queue

Cores per node

--cpus-per-task for 2 tasks per node

cosma8

128

64

cosma7, cosma7-rp

28

14

cosma5

256

128

Each core has two hardware threads, so a program that counts the available CPUs itself will see twice as many. Setting OMP_NUM_THREADS avoids this. See threads and CPUs, and MPI hints for more on pinning.

To use only some of the cores on each node, for example to give each task more memory, use fewer tasks per node. For example, for 8 tasks with 2 cores each on 32 COSMA7 nodes:

#SBATCH --nodes=32
#SBATCH --ntasks-per-node=8
#SBATCH --cpus-per-task=2

Many single-core tasks

For many independent single-core tasks, use a job array on a queue that shares nodes, such as cosma8-serial or cosma5.

To run many tasks inside one job on a whole node, see the example in /cosma/home/sample-user/parallel_tasks/. Copy it to your own directory, compile the C code with make, and edit slurm_batch.sh.

Heterogeneous jobs

Slurm can give one job several groups of nodes, each with different resources:

#SBATCH -A PROJECT
#SBATCH --time=72:00:00

#SBATCH -p cosma8
#SBATCH --nodes=1
#SBATCH --ntasks-per-node=1

#SBATCH hetjob

#SBATCH -p cosma8
#SBATCH --nodes=2
#SBATCH --ntasks-per-node=8

This requests one node with one task, and two more nodes with 16 tasks between them. mpirun does not understand this kind of allocation, so MPI programs should be started with srun instead, for example:

salloc -A PROJECT --time=72:00:00 -p cosma8 --nodes=3
srun --nodes=1 --ntasks-per-node=1 ./server : --nodes=2 --ntasks-per-node=8 ./client

This starts a server task alone on the first node, and 16 client tasks on the other two nodes. All of the tasks are in the same MPI_COMM_WORLD.

Another example:

#SBATCH -A PROJECT
#SBATCH --time=12:00:00

#SBATCH -p cosma8
#SBATCH --ntasks=64
#SBATCH --ntasks-per-node=16
#SBATCH --distribution=block:fcyclic:fcyclic,Pack

#SBATCH hetjob

#SBATCH -p cosma8
#SBATCH --ntasks=28
#SBATCH --ntasks-per-node=1
#SBATCH --distribution=cyclic

mpirun -np 64 ./swift_mpi -v 1 --pin --threads=8 --cosmology --self-gravity params.yml : \
-np 28 ./swift_mpi -v 1 --pin --threads=128 --cosmology --self-gravity params.yml

You may need to change --distribution. This example fills each node with tasks before moving to the next one (block and Pack), then hands out tasks within a node round-robin between the sockets and cores (fcyclic). The Slurm documentation lists which options must be the same for all parts of the job, and which can differ.

Open MPI supports heterogeneous jobs, but only when it is built with a process management interface (PMI) library. If it is not, a clear error message is shown. Intel MPI seems to work to some extent if you set export I_MPI_PMI_LIBRARY=/usr/lib64/libpmi.so, but it may not fully support heterogeneous jobs. For example, mixing nodes with exactly 1 task and nodes with more than 1 task can crash. See the Slurm heterogeneous jobs guide.

Using DDT

To use the DDT debugger with Slurm, follow these instructions. There is also an example Slurm script in /cosma/home/sample-user/slurm_ddt_example.qtf, which DDT uses to generate a batch script.

Priority

The order in which pending jobs start depends mainly on how much your project has used recently (fairshare), and how long the job has been waiting: see scheduling and fairshare, and how jobs are prioritised.

To let other jobs go first, you can lower the priority of your own job:

scontrol update JobId=JOBID Nice=100

A higher value means a lower priority. Only staff can raise a job’s priority.

Monitoring jobs

The showq command shows the jobs in a queue (in addition to squeue and sinfo), for example:

showq -q cosma7 -l -f -o

The c7jobload and c8jobload commands show the load (CPU demand) of a running job. Use -h to see the options. For example:

c8jobload -l JOBID

sstat shows the resources used by a running job, and sacct by a finished one. For example, to print the memory used so far at the end of your job script:

sstat --jobs=${SLURM_JOB_ID}.batch --format=jobid,maxrss,ntasks

GPUs

To request GPUs, see GPU jobs, and GPUs for the hardware. Some GPU queues are charged by GPU, not CPU: the cosma8-draper queue (project dp266) and the mi300x queue (project do018). On these, request GPUs with --gpus=N, where N is the number of GPUs.

Reservations

It is possible to request a Slurm reservation for jobs that will need around 40% or more of the cluster at the same time. A reservation sets aside the requested number of nodes for a set period of time, for exclusive use. This lets large jobs restart efficiently, without having to wait for many nodes to become free, which improves cluster efficiency.

A reservation needs to be authorised by the Service Management Board, and 1 month’s notice should be given if possible. The request should say how many nodes are needed (we will add a few more in case of node failures), for how long, a brief description of the science, and why the reservation is needed.

Your project will be charged for the entire reservation, not just for the time you use, so it is essential to keep a queue of jobs ready to run in it.

Once you have a reservation, use scontrol show reservation to view it, and submit jobs to it with #SBATCH --reservation=RESERVATION_NAME in your job script.

HDF5 profiling

The Slurm HDF5 profiling plugin is enabled. It can record profiling information from a job in an HDF5 file. To use it, add #SBATCH --profile=<all|none|energy|task|filesystem|network> to your job script. Results are stored in /cosma/apps/slurm/profile_data/USERNAME.

After the job has finished, run sh5util -j JOBID to combine the files from each node into a single file in the current directory. You can then view it with the h5ls command, from the hdf5 module.

Usage reports

sreport reports on usage. For example, for a project’s usage in October 2026, by user, in CPU hours:

sreport cluster AccountUtilizationByUser start=2026-10-01 end=2026-11-01 Account=dpXXX -t hours

Without -t hours, the usage is reported in CPU minutes.